Installation and Start-Up | 3-7
Installing the Optical Bench Assembly
The Optical Bench Assembly – shipped in a separate box – must be in-
stalled in the analyzer’s Electronics Enclosure after the analyzer has been
installed.
All electrical connections to the Optical Bench are made via pre-wired
connector plugs. No hard wiring is required.
To install the Optical Bench (Figures 3-2, 3-3, and 3-4):
Ensure there is no power being supplied to the analyzer while install-
ing the Optical Bench.
1. The Measuring Cell comes installed in the Analyzer Oven. Before
installing the Optical Bench, first remove the Measuring Cell from the
Oven and connect it to the Optical Bench. To do this:
a. Open the Oven and disconnect the Sample and Vent Line tubes
from their fittings on the Measuring Cell.
b. Remove the Heat Transfer Block Plug from the counter bore hole
in the Heat Transfer Block (Figure 3-4). Grasp the Measuring Cell
and remove the M4 x 25 screw inside the Heat Transfer Block
using only a flat hex key.
Do not use a ball driver – the head can
break off inside the screw.
Remove the Measuring Cell and set it aside.
c. Remove the Optical Bench from its shipping box and then from its
ESD-safe packaging.
Remove the (3) M4 x 12 screws from the Beam Splitter (part of the
Optical Bench) – Figure 3-4.
Remove the dust cover and the Installation Tag from the
Measuring Cell. Use the (3) M4 x 12 screws to secure the Cell
Extension to the Beam Splitter on the Optical Bench.
2. Open the Electronics Enclosure and locate the blue Support Arm Yoke,
in the top-left corner of the Electronics Enclosure. Loosen the set screw
securing the outermost pivot pin in the Support Arm Yoke and remove
the pin.
With the blue Support Arm Yoke fully extended, lift the Optical Bench/
Measuring Cell Assembly by its upper portion and carefully move it
toward the analyzer. Align its Optical Bench Support Plate with the
Support Arm Yoke and replace the pivot pin. Tighten the set screw.
The Optical Bench should swing freely.
!
WARNING
Содержание 920
Страница 39: ...Specifications 2 11 ...
Страница 40: ...2 12 Model 920 Multi Gas Analyzer ...
Страница 41: ...Specifications 2 13 2019 02 05 ...
Страница 42: ...2 14 Model 920 Multi Gas Analyzer ...
Страница 43: ...Specifications 2 15 ...
Страница 44: ...2 16 Model 920 Multi Gas Analyzer ...
Страница 45: ...Specifications 2 17 ...
Страница 47: ...Specifications 2 19 Heater Plate ATEX and IECEx Certificates and Marking ...
Страница 48: ...2 20 Model 920 Multi Gas Analyzer ...
Страница 49: ...Specifications 2 21 ...
Страница 50: ...2 22 Model 920 Multi Gas Analyzer ...
Страница 51: ...Specifications 2 23 ...
Страница 52: ...2 24 Model 920 Multi Gas Analyzer ...
Страница 53: ...Specifications 2 25 ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 54: ...2 26 Model 920 Multi Gas Analyzer Disconnect Enclosure Type 200 ATEX and IECEx Certificates and Marking ...
Страница 55: ...Specifications 2 27 ...
Страница 56: ...2 28 Model 920 Multi Gas Analyzer ...
Страница 57: ...Specifications 2 29 ...
Страница 58: ...2 30 Model 920 Multi Gas Analyzer ...
Страница 59: ...Specifications 2 31 ...
Страница 60: ...2 32 Model 920 Multi Gas Analyzer ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 71: ...Installation and Start Up 3 11 Figure 3 4 Optical Bench Measuring Cell assembly ...
Страница 99: ...Installation and Start Up 3 39 Figure 3 11 Over Temp alarm reset switch SW300 Termination board ...
Страница 108: ...3 48 Model 920 Multi Gas Analyzer This page intentionally left blank ...
Страница 173: ...Controller User Interface 4 65 Figure 4 8 Customer signal connections ...
Страница 187: ...Maintenance and Troubleshooting 5 11 Figure 5 1 Measuring Cell assembly ...
Страница 211: ...Maintenance and Troubleshooting 5 35 Figure 5 5 Optical Bench Chopper Assembly Maintenance Diagram ...
Страница 226: ...5 50 Model 920 Multi Gas Analyzer Figure 5 8 Flameproof Heater Seal Assembly layout WX 14324 1A ...
Страница 227: ...Maintenance and Troubleshooting 5 51 Figure 5 9 Flameproof Heater Seal internal component layout 100 1622 1A ...
Страница 228: ...5 52 Model 920 Multi Gas Analyzer Figure 5 10 Oven Heater and Temperature Sensor wiring WX 14161 ...
Страница 243: ...Maintenance and Troubleshooting 5 67 Figure 5 13 Over temp alarm reset switch SW300 Termination board ...
Страница 262: ...A 2 Model 920 Multi Gas Analyzer Ribbon Cable Interconnect WX 102836 ...
Страница 263: ...Appendix A Drawings A 3 GP Lower Enclosure to Electronics Wiring CE Analyzers WX 102810 ...
Страница 264: ...A 4 Model 920 Multi Gas Analyzer Heater and Sensor Wiring GP Div 2 Analyzers WX 102851 ...
Страница 265: ...Appendix A Drawings A 5 Heater and Sensor Wiring CE Zone 1 Analyzers WX 102852 ...
Страница 266: ...A 6 Model 920 Multi Gas Analyzer Lower Cabinet Wiring CE GP Analyzers 120V 100 1341 3 ...
Страница 267: ...Appendix A Drawings A 7 Lower Cabinet Wiring CE GP Analyzers 240V 100 1342 3 ...
Страница 268: ...A 8 Model 920 Multi Gas Analyzer Signal Wiring PD GP Div 2 CE Zone 1 Analyzers WX 102815 ...
Страница 270: ...A 10 Model 920 Multi Gas Analyzer 15V and 5V Power Supply DC Wiring GP Div 2 CE Zone 1 Analyzers WX 102811 ...
Страница 271: ...Appendix A Drawings A 11 24V Power Supply DC Wiring CE Zone 1 Analyzers WX 102812 ...
Страница 272: ...A 12 Model 920 Multi Gas Analyzer RS 232 Communications Cable Wiring 300 9480 ...
Страница 273: ...Appendix A Drawings A 13 RS 232 RS 485 Module Wiring CE Zone 1 GP Div 2 Analyzers 100 2185 ...
Страница 274: ...A 14 Model 920 Multi Gas Analyzer Microcontroller Board 100 0117 ...
Страница 275: ...Appendix A Drawings A 15 Host Controller Board Display Interface 100 0138 ...
Страница 276: ...A 16 Model 920 Multi Gas Analyzer Model 9xx Series Analyzer Type 200 Disconnect Enclosure Details ...
Страница 278: ...S 2 Model 920 Multi Gas Analyzer This page intentionally left blank ...