Installation and Start-Up | 3-19
Installing the Steam Lines (if Used)
This section applies only to applications using steam-heated valves.
For details about steam supply requirements, refer to the “Block
Diagram” and “Piping & Instrumentation Diagram” in the analyzer
Documentation Package.
The Steam Inlet/Exhaust tubing (by customer) transports steam which
heats the sample gas at the extraction point.
The tubing must be 1/4" or 3/8" 316 stainless steel tubing. If using 1/4" line,
1/4" NPT-F connectors are required; if using 3/8" tubing, 3/8"-to-1/4" NPT-F
(reducing) connectors are required. The steam must be dry saturated
steam, supplied at a pressure as per application specifications.
When installing the Steam Inlet/Exhaust piping, refer to Sample Probe
drawings in the analyzer
Documentation Package
.
To install the Steam Inlet/Exhaust tubing:
1. After the Sample Probe Valve and Vent Valve Assemblies have been
installed, run the tubing from the steam source to the Sample Probe
Valve.
Using NPT-F connectors, connect one end of the steam tubing to the
steam source and the other end to the Steam Inlet port on the Sample
Probe Valve.
For both the Steam Inlet/Exhaust tubes, configure the steam plumbing
to avoid back pressure and/or steam flow restrictions.
Maintain the heating quality of the steam.
2. Install tubing between the Sample Probe Valve and Vent Valve. Use
1/4" NPT-F connectors to connect the tubing from the Steam Exhaust
port on the Sample Probe Valve to the Steam Inlet port on the Valve
Assembly.
Run 1/4" stainless steel tubing from the Vent Valve to the steam/con-
densate exhaust location. Using a 1/4" NPT-F connector, connect the
steam tubing to the Steam Exhaust port on the Vent Valve and to the
steam/condensate exhaust location on the other end.
NOTE
NOTE
Содержание 920
Страница 39: ...Specifications 2 11 ...
Страница 40: ...2 12 Model 920 Multi Gas Analyzer ...
Страница 41: ...Specifications 2 13 2019 02 05 ...
Страница 42: ...2 14 Model 920 Multi Gas Analyzer ...
Страница 43: ...Specifications 2 15 ...
Страница 44: ...2 16 Model 920 Multi Gas Analyzer ...
Страница 45: ...Specifications 2 17 ...
Страница 47: ...Specifications 2 19 Heater Plate ATEX and IECEx Certificates and Marking ...
Страница 48: ...2 20 Model 920 Multi Gas Analyzer ...
Страница 49: ...Specifications 2 21 ...
Страница 50: ...2 22 Model 920 Multi Gas Analyzer ...
Страница 51: ...Specifications 2 23 ...
Страница 52: ...2 24 Model 920 Multi Gas Analyzer ...
Страница 53: ...Specifications 2 25 ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 54: ...2 26 Model 920 Multi Gas Analyzer Disconnect Enclosure Type 200 ATEX and IECEx Certificates and Marking ...
Страница 55: ...Specifications 2 27 ...
Страница 56: ...2 28 Model 920 Multi Gas Analyzer ...
Страница 57: ...Specifications 2 29 ...
Страница 58: ...2 30 Model 920 Multi Gas Analyzer ...
Страница 59: ...Specifications 2 31 ...
Страница 60: ...2 32 Model 920 Multi Gas Analyzer ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 71: ...Installation and Start Up 3 11 Figure 3 4 Optical Bench Measuring Cell assembly ...
Страница 99: ...Installation and Start Up 3 39 Figure 3 11 Over Temp alarm reset switch SW300 Termination board ...
Страница 108: ...3 48 Model 920 Multi Gas Analyzer This page intentionally left blank ...
Страница 173: ...Controller User Interface 4 65 Figure 4 8 Customer signal connections ...
Страница 187: ...Maintenance and Troubleshooting 5 11 Figure 5 1 Measuring Cell assembly ...
Страница 211: ...Maintenance and Troubleshooting 5 35 Figure 5 5 Optical Bench Chopper Assembly Maintenance Diagram ...
Страница 226: ...5 50 Model 920 Multi Gas Analyzer Figure 5 8 Flameproof Heater Seal Assembly layout WX 14324 1A ...
Страница 227: ...Maintenance and Troubleshooting 5 51 Figure 5 9 Flameproof Heater Seal internal component layout 100 1622 1A ...
Страница 228: ...5 52 Model 920 Multi Gas Analyzer Figure 5 10 Oven Heater and Temperature Sensor wiring WX 14161 ...
Страница 243: ...Maintenance and Troubleshooting 5 67 Figure 5 13 Over temp alarm reset switch SW300 Termination board ...
Страница 262: ...A 2 Model 920 Multi Gas Analyzer Ribbon Cable Interconnect WX 102836 ...
Страница 263: ...Appendix A Drawings A 3 GP Lower Enclosure to Electronics Wiring CE Analyzers WX 102810 ...
Страница 264: ...A 4 Model 920 Multi Gas Analyzer Heater and Sensor Wiring GP Div 2 Analyzers WX 102851 ...
Страница 265: ...Appendix A Drawings A 5 Heater and Sensor Wiring CE Zone 1 Analyzers WX 102852 ...
Страница 266: ...A 6 Model 920 Multi Gas Analyzer Lower Cabinet Wiring CE GP Analyzers 120V 100 1341 3 ...
Страница 267: ...Appendix A Drawings A 7 Lower Cabinet Wiring CE GP Analyzers 240V 100 1342 3 ...
Страница 268: ...A 8 Model 920 Multi Gas Analyzer Signal Wiring PD GP Div 2 CE Zone 1 Analyzers WX 102815 ...
Страница 270: ...A 10 Model 920 Multi Gas Analyzer 15V and 5V Power Supply DC Wiring GP Div 2 CE Zone 1 Analyzers WX 102811 ...
Страница 271: ...Appendix A Drawings A 11 24V Power Supply DC Wiring CE Zone 1 Analyzers WX 102812 ...
Страница 272: ...A 12 Model 920 Multi Gas Analyzer RS 232 Communications Cable Wiring 300 9480 ...
Страница 273: ...Appendix A Drawings A 13 RS 232 RS 485 Module Wiring CE Zone 1 GP Div 2 Analyzers 100 2185 ...
Страница 274: ...A 14 Model 920 Multi Gas Analyzer Microcontroller Board 100 0117 ...
Страница 275: ...Appendix A Drawings A 15 Host Controller Board Display Interface 100 0138 ...
Страница 276: ...A 16 Model 920 Multi Gas Analyzer Model 9xx Series Analyzer Type 200 Disconnect Enclosure Details ...
Страница 278: ...S 2 Model 920 Multi Gas Analyzer This page intentionally left blank ...