5-4 | Model 920 Multi-Gas Analyzer
Frequency Task
Monthly
Check Analyzer Response Time
Note: Do this task in conjunction with the monthly task “Check the PMT
Signals” above.
Manually Zero the analyzer. After the Zero is complete, determine the
sample response time by switching the analyzer from
Continuous
Backpurge
mode to
Continuous Sample
mode. Observe the RUN
mode normal display and record the time it takes the analyzer to display
the first reading after the switch. Typically, a good response time is in
the range of 30 seconds. A response time that is slower than normal
may suggest plugging problems in the analyzer’s sample system.
Refer to “Manually Zeroing the Analyzer” and “Setting the Sample
Gas Flow Rate and Sample Response Time” in Chapter 3. See also
“Preventing, Detecting, and Locating a Plug in the Sample System” in
this chapter.
Monthly
Pressure Gauge
Check the Aspirator Pressure gauge.
Aspirator air pressure should be set in the range of 7–35 KPAG (1–5
PSIG). See “Setting the Sample Gas Flow Rate and Sample Response
Time” in Chapter 3.
Pressure Transducer Air pressure is set at a nominal 105 KPAG (15
PSIG).
CAUTION:
To avoid damaging the pressure transducer, do not set the
pressure higher than 105 KPAG (15 PSIG).
Monthly
Temperature Zones
Check and record the temperatures of all temperature zones and ensure
they are all within 5 % of their
Set Point
values.
Every 3 Months
Sample Conditioning Unit (SCU), Optional
If your analyzer uses a SCU, change the filter elements in the SCU
(Probe). If the gaskets are damaged, replace them at the same time.
Clean the parts that make up the filter assemblies.
Replace the
gaskets at 6-month intervals, minimum.
Depending on sample stream contamination levels (i.e., sample
response time is continually decreasing), replacing filters and cleaning
the SCU more frequently may be necessary. This may be evident
if response time is longer than normal, or if a good zero cannot be
achieved.
If your system uses a SCU (or other sample gas extraction unit) from a
manufacturer other than AMETEK, refer to its manual for maintenance
requirements.
Every 6 Months
Sheltered Systems
If the analyzer is installed in a custom shelter, check the air filters for the
shelter purge and air conditioning systems, and replace if necessary.
Depending on the environmental conditions of the site, more frequent
filter replacement may be necessary.
Every 6 Months
Sample/Vent Lines
Inspect the Sample Line and Vent Line (if used) for sags, sharp
bends, or damage to the outer skin. If necessary, take appropriate
safety precautions and replace the lines. Perform a leak check on all
associated fittings after replacing any line(s).
Содержание 920
Страница 39: ...Specifications 2 11 ...
Страница 40: ...2 12 Model 920 Multi Gas Analyzer ...
Страница 41: ...Specifications 2 13 2019 02 05 ...
Страница 42: ...2 14 Model 920 Multi Gas Analyzer ...
Страница 43: ...Specifications 2 15 ...
Страница 44: ...2 16 Model 920 Multi Gas Analyzer ...
Страница 45: ...Specifications 2 17 ...
Страница 47: ...Specifications 2 19 Heater Plate ATEX and IECEx Certificates and Marking ...
Страница 48: ...2 20 Model 920 Multi Gas Analyzer ...
Страница 49: ...Specifications 2 21 ...
Страница 50: ...2 22 Model 920 Multi Gas Analyzer ...
Страница 51: ...Specifications 2 23 ...
Страница 52: ...2 24 Model 920 Multi Gas Analyzer ...
Страница 53: ...Specifications 2 25 ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 54: ...2 26 Model 920 Multi Gas Analyzer Disconnect Enclosure Type 200 ATEX and IECEx Certificates and Marking ...
Страница 55: ...Specifications 2 27 ...
Страница 56: ...2 28 Model 920 Multi Gas Analyzer ...
Страница 57: ...Specifications 2 29 ...
Страница 58: ...2 30 Model 920 Multi Gas Analyzer ...
Страница 59: ...Specifications 2 31 ...
Страница 60: ...2 32 Model 920 Multi Gas Analyzer ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 71: ...Installation and Start Up 3 11 Figure 3 4 Optical Bench Measuring Cell assembly ...
Страница 99: ...Installation and Start Up 3 39 Figure 3 11 Over Temp alarm reset switch SW300 Termination board ...
Страница 108: ...3 48 Model 920 Multi Gas Analyzer This page intentionally left blank ...
Страница 173: ...Controller User Interface 4 65 Figure 4 8 Customer signal connections ...
Страница 187: ...Maintenance and Troubleshooting 5 11 Figure 5 1 Measuring Cell assembly ...
Страница 211: ...Maintenance and Troubleshooting 5 35 Figure 5 5 Optical Bench Chopper Assembly Maintenance Diagram ...
Страница 226: ...5 50 Model 920 Multi Gas Analyzer Figure 5 8 Flameproof Heater Seal Assembly layout WX 14324 1A ...
Страница 227: ...Maintenance and Troubleshooting 5 51 Figure 5 9 Flameproof Heater Seal internal component layout 100 1622 1A ...
Страница 228: ...5 52 Model 920 Multi Gas Analyzer Figure 5 10 Oven Heater and Temperature Sensor wiring WX 14161 ...
Страница 243: ...Maintenance and Troubleshooting 5 67 Figure 5 13 Over temp alarm reset switch SW300 Termination board ...
Страница 262: ...A 2 Model 920 Multi Gas Analyzer Ribbon Cable Interconnect WX 102836 ...
Страница 263: ...Appendix A Drawings A 3 GP Lower Enclosure to Electronics Wiring CE Analyzers WX 102810 ...
Страница 264: ...A 4 Model 920 Multi Gas Analyzer Heater and Sensor Wiring GP Div 2 Analyzers WX 102851 ...
Страница 265: ...Appendix A Drawings A 5 Heater and Sensor Wiring CE Zone 1 Analyzers WX 102852 ...
Страница 266: ...A 6 Model 920 Multi Gas Analyzer Lower Cabinet Wiring CE GP Analyzers 120V 100 1341 3 ...
Страница 267: ...Appendix A Drawings A 7 Lower Cabinet Wiring CE GP Analyzers 240V 100 1342 3 ...
Страница 268: ...A 8 Model 920 Multi Gas Analyzer Signal Wiring PD GP Div 2 CE Zone 1 Analyzers WX 102815 ...
Страница 270: ...A 10 Model 920 Multi Gas Analyzer 15V and 5V Power Supply DC Wiring GP Div 2 CE Zone 1 Analyzers WX 102811 ...
Страница 271: ...Appendix A Drawings A 11 24V Power Supply DC Wiring CE Zone 1 Analyzers WX 102812 ...
Страница 272: ...A 12 Model 920 Multi Gas Analyzer RS 232 Communications Cable Wiring 300 9480 ...
Страница 273: ...Appendix A Drawings A 13 RS 232 RS 485 Module Wiring CE Zone 1 GP Div 2 Analyzers 100 2185 ...
Страница 274: ...A 14 Model 920 Multi Gas Analyzer Microcontroller Board 100 0117 ...
Страница 275: ...Appendix A Drawings A 15 Host Controller Board Display Interface 100 0138 ...
Страница 276: ...A 16 Model 920 Multi Gas Analyzer Model 9xx Series Analyzer Type 200 Disconnect Enclosure Details ...
Страница 278: ...S 2 Model 920 Multi Gas Analyzer This page intentionally left blank ...