Maintenance and Troubleshooting
|
5-43
OPTIONAL
If working on the Heater Plate with it still in the Oven is not practi-
cal, remove it from the Oven. To do this, record all wire termination
points at the Terminal Strips (
J1, J2
) inside the Seal Body and then
disconnect the wires.
Unscrew the Thermal Insulating Tube from the Lower Heater Plate,
and move the tube downward to free it from the Heater Plate.
Rotate the Seal Body/Thermal Insulation Tube away from the ana-
lyzer to allow more room to remove the Heater Plate, taking care not
to damage the wires.
Tilt the top of the Heater Plate forward and pull the Heater Plate up
and out of the Oven. Move the Heater Plate to a suitable work bench
to work on it.
11. Replace the Heater Elements and RTDs (Figures 5-8 and 5-9):
Replacing a faulty Heater Element:
a. Remove the faulty Heater Element from its channel in the Upper
Heater Plate and carefully pull its wire out from the Seal Body and
through the Lower Heater Plate.
b. Install a new Heater Element (P/N 300-8684) in the channel it was
removed from.
c. Label the Heater Element wire “Overtemp Heater” or “Heater” as
required.
Replacing internal
Overtemp
and/or
Heater
RTDs:
Looking at the front of the Heater Plate, the RTD on the right side is
“Overtemp” and the RTD on the left side is “Heater”.
a. Unscrew the faulty RTD from the Upper Heater Plate and care-
fully pull its wire out from the Seal Body and through the Lower
Heater Plate.
b. Thread the new RTD (P/N 300-4924) into the Upper Heater Plate
and tighten it using short needle-nose pliers.
Label the RTD wire “Overtemp RTD” or “Heater RTD” as required.
c. Repeat Steps ‘a’ and ‘b’ if replacing the other RTD.
NOTE
NOTE
Содержание 920
Страница 39: ...Specifications 2 11 ...
Страница 40: ...2 12 Model 920 Multi Gas Analyzer ...
Страница 41: ...Specifications 2 13 2019 02 05 ...
Страница 42: ...2 14 Model 920 Multi Gas Analyzer ...
Страница 43: ...Specifications 2 15 ...
Страница 44: ...2 16 Model 920 Multi Gas Analyzer ...
Страница 45: ...Specifications 2 17 ...
Страница 47: ...Specifications 2 19 Heater Plate ATEX and IECEx Certificates and Marking ...
Страница 48: ...2 20 Model 920 Multi Gas Analyzer ...
Страница 49: ...Specifications 2 21 ...
Страница 50: ...2 22 Model 920 Multi Gas Analyzer ...
Страница 51: ...Specifications 2 23 ...
Страница 52: ...2 24 Model 920 Multi Gas Analyzer ...
Страница 53: ...Specifications 2 25 ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 54: ...2 26 Model 920 Multi Gas Analyzer Disconnect Enclosure Type 200 ATEX and IECEx Certificates and Marking ...
Страница 55: ...Specifications 2 27 ...
Страница 56: ...2 28 Model 920 Multi Gas Analyzer ...
Страница 57: ...Specifications 2 29 ...
Страница 58: ...2 30 Model 920 Multi Gas Analyzer ...
Страница 59: ...Specifications 2 31 ...
Страница 60: ...2 32 Model 920 Multi Gas Analyzer ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Страница 71: ...Installation and Start Up 3 11 Figure 3 4 Optical Bench Measuring Cell assembly ...
Страница 99: ...Installation and Start Up 3 39 Figure 3 11 Over Temp alarm reset switch SW300 Termination board ...
Страница 108: ...3 48 Model 920 Multi Gas Analyzer This page intentionally left blank ...
Страница 173: ...Controller User Interface 4 65 Figure 4 8 Customer signal connections ...
Страница 187: ...Maintenance and Troubleshooting 5 11 Figure 5 1 Measuring Cell assembly ...
Страница 211: ...Maintenance and Troubleshooting 5 35 Figure 5 5 Optical Bench Chopper Assembly Maintenance Diagram ...
Страница 226: ...5 50 Model 920 Multi Gas Analyzer Figure 5 8 Flameproof Heater Seal Assembly layout WX 14324 1A ...
Страница 227: ...Maintenance and Troubleshooting 5 51 Figure 5 9 Flameproof Heater Seal internal component layout 100 1622 1A ...
Страница 228: ...5 52 Model 920 Multi Gas Analyzer Figure 5 10 Oven Heater and Temperature Sensor wiring WX 14161 ...
Страница 243: ...Maintenance and Troubleshooting 5 67 Figure 5 13 Over temp alarm reset switch SW300 Termination board ...
Страница 262: ...A 2 Model 920 Multi Gas Analyzer Ribbon Cable Interconnect WX 102836 ...
Страница 263: ...Appendix A Drawings A 3 GP Lower Enclosure to Electronics Wiring CE Analyzers WX 102810 ...
Страница 264: ...A 4 Model 920 Multi Gas Analyzer Heater and Sensor Wiring GP Div 2 Analyzers WX 102851 ...
Страница 265: ...Appendix A Drawings A 5 Heater and Sensor Wiring CE Zone 1 Analyzers WX 102852 ...
Страница 266: ...A 6 Model 920 Multi Gas Analyzer Lower Cabinet Wiring CE GP Analyzers 120V 100 1341 3 ...
Страница 267: ...Appendix A Drawings A 7 Lower Cabinet Wiring CE GP Analyzers 240V 100 1342 3 ...
Страница 268: ...A 8 Model 920 Multi Gas Analyzer Signal Wiring PD GP Div 2 CE Zone 1 Analyzers WX 102815 ...
Страница 270: ...A 10 Model 920 Multi Gas Analyzer 15V and 5V Power Supply DC Wiring GP Div 2 CE Zone 1 Analyzers WX 102811 ...
Страница 271: ...Appendix A Drawings A 11 24V Power Supply DC Wiring CE Zone 1 Analyzers WX 102812 ...
Страница 272: ...A 12 Model 920 Multi Gas Analyzer RS 232 Communications Cable Wiring 300 9480 ...
Страница 273: ...Appendix A Drawings A 13 RS 232 RS 485 Module Wiring CE Zone 1 GP Div 2 Analyzers 100 2185 ...
Страница 274: ...A 14 Model 920 Multi Gas Analyzer Microcontroller Board 100 0117 ...
Страница 275: ...Appendix A Drawings A 15 Host Controller Board Display Interface 100 0138 ...
Страница 276: ...A 16 Model 920 Multi Gas Analyzer Model 9xx Series Analyzer Type 200 Disconnect Enclosure Details ...
Страница 278: ...S 2 Model 920 Multi Gas Analyzer This page intentionally left blank ...