2.
Push the “magnet” onto the motor shaft.
It should now look like this...
The motor wires can be protected by shrinking foil and liquid
rubber.
Push the holder (with installed motor and “magnet”) into
Part01
SPG back.
Install the poly-carbonate tube
The poly-carbonate tube is a very important part
for the spinning function.
The tube holds one of the bearings (bearing 1).
The tube needs a planar and smooth right-
angled end to make sure the rotation axis is
straight!
Install the bearing 1
and
push the PC-tube
through the tube-holder
down to the
bearing1
.
Check the length of the tube and make
adjustments if necessary.
The tube should touch the bearing without
pressure!
Run the motor and make a test.
When everything works and fits nicely,
remove motor-holder and
PC-tube again (push out the motor-holder by pushing the PC-tube in motor direction).
Attach PC-tube and motor
Install the motor-holder again and use 1-
2 Epoxy drops to just fix the position.
Add some flexible glue to the PC-tube
and push it into the tube holder down to
the bearing1.
Again...
The tube should touch the
bearing without pressure!
Run the motor for a moment and let
everything dry well!
Now the SPG should look like this...
49
Содержание Chassis system 3.0
Страница 11: ...Main Section USB USB B USB C Metal Master 06 Tech USB B Metal Master 06 Tech USB C 11...
Страница 12: ...Speaker Section Part 08 Metal Master Speaker Chamber Metal Master 08 speaker cover 12...
Страница 60: ...If you have any questions feel free to contact me info mb Sabers com 60...