
FOCKE MELER GLUING SOLUTIONS, S.A.
4-14
MELTER OPERATION
Programming equipment activation/deactivation
You may program an activation and a deactivation time for every day of the
week, from Monday (1) to Sunday (7).
Time is expressed in 15 minute increments, so we cycle from 10.0 (10 hours
and 0 minutes) to 10.1 (10 hours and 15 minutes) to 10.2 (10 hours and 30
minutes) to 10.3 (10 hours and 45 minutes).
1. Press the button with the clock symbol.
A ‘0’ will appear on the display, indicating the program for current day
and hour information.
2. Use the up-down arrow to select the value for the desired day of the
week, from Monday (1) to Sunday (7).
3. Press the button with the clock symbol once again.
Two times will appear, one in each display. The display on the left shows
the start time, while the display on the right shows the finish time.
4. The blinking dot next to the start time indicates that this is the value
that may be modified. Use the up-down arrow to select the desired
value.
5. Press the button with the clock symbol once again.
The dot changes to the finish time.
6. Use the up-down arrow to select the desired value.
7. Press the button with the clock symbol once again.
The selected program will appear once again. Use the up-down arrow
to select other programs.
8. Pressing either the left or the right arrow button will exit this program
and return to the platen temperature display.
The green LED next to the ‘ON/OFF’ button will remain blinking as long as
there is an equipment disconnection time programmed for the current day.
Содержание PS200
Страница 1: ...MA 5066 ENG 250220 GLUING SOLUTIONS ADHESIVE MELTER PS200 DRUM UNLOADER INSTRUCTIONS MANUAL ...
Страница 8: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Страница 34: ...FOCKE MELER GLUING SOLUTIONS S A 3 12 INSTALLATION This page is intentionally left blank ...
Страница 68: ...FOCKE MELER GLUING SOLUTIONS S A 4 34 MELTER OPERATION ...
Страница 75: ...ELECTRICAL DRAWINGS 7 1 MA 5066 ENG PS200 DRUM MELTER MANUAL 7 ELECTRICAL DRAWINGS ...
Страница 76: ...FOCKE MELER GLUING SOLUTIONS S A 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Страница 78: ...FOCKE MELER GLUING SOLUTIONS S A 8 2 PNEUMATIC DIAGRAMS 1 2 3 4 5 6 9 8 7 11 12 10 13 14 ...
Страница 80: ...FOCKE MELER GLUING SOLUTIONS S A 8 4 PNEUMATIC DIAGRAMS This page is intentionally left blank ...
Страница 82: ...FOCKE MELER GLUING SOLUTIONS 9 2 SPARE PARTS LIST A STRUCTURE 7 5 4 6 2 3 9 8 1 ...
Страница 84: ...FOCKE MELER GLUING SOLUTIONS 9 4 SPARE PARTS LIST B PLATEN ENSEMBLE 2 3 4 5 7 8 6 1 ...
Страница 86: ...FOCKE MELER GLUING SOLUTIONS 9 6 SPARE PARTS LIST C SIMPLE MANIFOLD ENSEMBLE 7 5 13 14 9 10 11 12 3 4 2 1 6 8 ...
Страница 88: ...FOCKE MELER GLUING SOLUTIONS 9 8 SPARE PARTS LIST C DOUBLE MANIFOLD ENSEMBLE 4 12 2 3 6 5 8 7 9 10 11 1 ...
Страница 98: ...FOCKE MELER GLUING SOLUTIONS 9 18 SPARE PARTS LIST This page is intentionally left blank ...