
INSTALLATION
3-3
MA-5066-ENG
PS200 DRUM MELTER MANUAL
Other factors
Other practical considerations must be taken into account for the installation
of PS200 drum melters:
• Keep the drum intake accessible in the equipment for easy
replacement.
• Position the drum melter in such a way that its front panel display
(which shows temperatures and any possible alarm signals) can be
easily seen.
• Try to avoid (as much as possible) unnecessary long hose lengths
that result in high electrical power consumptions and high pressure
requirements for the pump.
• Do not install the drum melter next to any potential heat or cold
sources that might affect its operation.
• Provide easy access to the melting equipment’s maintenance areas
(for drum loading, plate cleaning, pressure and flow adjustments, the
electrical panel, etc.)
Unpacking
Before beginning to install the drum melter, it must be removed from
its position on the pallet and inspected in order to detect any possible
deterioration or damage. Inform your Meler agent or the Head Office of any
defect, including that to the outside packing materials.
Contents
The drum melter’s shipping packaging may contain accessory items that
were requested on the same order. Otherwise, the standard elements that
accompany the melting equipment are as follows:
• Instruction manual.
• Warranty card.
• Hose connection adapters.
• Cable gland Pg for power supply connection (on cabinet).
• External signals connectors (included on control and power boards).
Equipment placement
Place the equipment on a horizontal plane in order to prevent uncontrolled
movements, Once the unit is at its place of operation, attach the base to
the floor, if necessary or adjust the height using the adjustable feet that are
included with the equipment.
Содержание PS200
Страница 1: ...MA 5066 ENG 250220 GLUING SOLUTIONS ADHESIVE MELTER PS200 DRUM UNLOADER INSTRUCTIONS MANUAL ...
Страница 8: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Страница 34: ...FOCKE MELER GLUING SOLUTIONS S A 3 12 INSTALLATION This page is intentionally left blank ...
Страница 68: ...FOCKE MELER GLUING SOLUTIONS S A 4 34 MELTER OPERATION ...
Страница 75: ...ELECTRICAL DRAWINGS 7 1 MA 5066 ENG PS200 DRUM MELTER MANUAL 7 ELECTRICAL DRAWINGS ...
Страница 76: ...FOCKE MELER GLUING SOLUTIONS S A 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Страница 78: ...FOCKE MELER GLUING SOLUTIONS S A 8 2 PNEUMATIC DIAGRAMS 1 2 3 4 5 6 9 8 7 11 12 10 13 14 ...
Страница 80: ...FOCKE MELER GLUING SOLUTIONS S A 8 4 PNEUMATIC DIAGRAMS This page is intentionally left blank ...
Страница 82: ...FOCKE MELER GLUING SOLUTIONS 9 2 SPARE PARTS LIST A STRUCTURE 7 5 4 6 2 3 9 8 1 ...
Страница 84: ...FOCKE MELER GLUING SOLUTIONS 9 4 SPARE PARTS LIST B PLATEN ENSEMBLE 2 3 4 5 7 8 6 1 ...
Страница 86: ...FOCKE MELER GLUING SOLUTIONS 9 6 SPARE PARTS LIST C SIMPLE MANIFOLD ENSEMBLE 7 5 13 14 9 10 11 12 3 4 2 1 6 8 ...
Страница 88: ...FOCKE MELER GLUING SOLUTIONS 9 8 SPARE PARTS LIST C DOUBLE MANIFOLD ENSEMBLE 4 12 2 3 6 5 8 7 9 10 11 1 ...
Страница 98: ...FOCKE MELER GLUING SOLUTIONS 9 18 SPARE PARTS LIST This page is intentionally left blank ...