
FOCKE MELER GLUING SOLUTIONS, S.A.
4-2
MELTER OPERATION
Starting up the melter equipment
Before starting up the melter equipment, it is necessary to check to see if
the unit has been correctly installed and all its input/output and accessory
connections are correctly established.
It is also necessary to make sure that the equipment has been filled with
adhesive and that the operational parameters have been programmed.
To start:
1. Connect the melter’s switch.
If the control card was turned off the last time the machine was disconnected,
it will remain turned off when the machine is started up again (time display).
If the control card was on the last time that the machine was disconnected, it
will turn on when the machine is started up again.
2. Press the ON/OFF button on the control card to turn it on, if it is not
already activated.
By default, the set point and real temperature values shown are those
corresponding to the platen.
The platen (and hoses and applicators connected) heating control LED (green)
will light up and the platen will begin to heat.
Once it has reached 3° below the programmed temperature (set point) of the
platen, a programmable delay timer starts until, guaranteeing fusion, the
pump receives permission to operate and the signal will be sent to the main
machine, indicated by the two corresponding (green) LEDs.
While the system is running the delay timer both LEDs remains blinking until
the programmed time value has been reached. If then, any other element has
not reached 3° below its temperature setting point, the LEDs turn off.
If the system is shut down, for any possible mode, when it is turning on the
delay timer only starts again if the platen temperature is 20° below setting
point.
3. Make sure that the working mode (on pumping card) is the required
(see Chapter ‘2. Introduction. Operating modes’).
If it is necessary to disconnect the melting equipment:
1. Push the button ON/OFF on the control panel.
2. Disconnect the equipment switch located at the front of the unit.
3. Disconnect the pneumatic power supply from the applicators and the
electrical power supply from the control programmer, if there is one.
Содержание PS200
Страница 1: ...MA 5066 ENG 250220 GLUING SOLUTIONS ADHESIVE MELTER PS200 DRUM UNLOADER INSTRUCTIONS MANUAL ...
Страница 8: ...FOCKE MELER GLUING SOLUTIONS TABLE OF CONTENTS This page is intentionally left blank ...
Страница 34: ...FOCKE MELER GLUING SOLUTIONS S A 3 12 INSTALLATION This page is intentionally left blank ...
Страница 68: ...FOCKE MELER GLUING SOLUTIONS S A 4 34 MELTER OPERATION ...
Страница 75: ...ELECTRICAL DRAWINGS 7 1 MA 5066 ENG PS200 DRUM MELTER MANUAL 7 ELECTRICAL DRAWINGS ...
Страница 76: ...FOCKE MELER GLUING SOLUTIONS S A 7 2 ELECTRICAL DRAWINGS This page is intentionally left blank ...
Страница 78: ...FOCKE MELER GLUING SOLUTIONS S A 8 2 PNEUMATIC DIAGRAMS 1 2 3 4 5 6 9 8 7 11 12 10 13 14 ...
Страница 80: ...FOCKE MELER GLUING SOLUTIONS S A 8 4 PNEUMATIC DIAGRAMS This page is intentionally left blank ...
Страница 82: ...FOCKE MELER GLUING SOLUTIONS 9 2 SPARE PARTS LIST A STRUCTURE 7 5 4 6 2 3 9 8 1 ...
Страница 84: ...FOCKE MELER GLUING SOLUTIONS 9 4 SPARE PARTS LIST B PLATEN ENSEMBLE 2 3 4 5 7 8 6 1 ...
Страница 86: ...FOCKE MELER GLUING SOLUTIONS 9 6 SPARE PARTS LIST C SIMPLE MANIFOLD ENSEMBLE 7 5 13 14 9 10 11 12 3 4 2 1 6 8 ...
Страница 88: ...FOCKE MELER GLUING SOLUTIONS 9 8 SPARE PARTS LIST C DOUBLE MANIFOLD ENSEMBLE 4 12 2 3 6 5 8 7 9 10 11 1 ...
Страница 98: ...FOCKE MELER GLUING SOLUTIONS 9 18 SPARE PARTS LIST This page is intentionally left blank ...