![Mec Titan Boom 60-S Скачать руководство пользователя страница 57](http://html1.mh-extra.com/html/mec/titan-boom-60-s/titan-boom-60-s_operators-manual_1758607057.webp)
Page 53
Ttan Boom
TM
60-S - Operator’s Manual
September 2020
Secton 12 - Transport and Lftng Instructons
Lifting Instructions
Only qualified riggers should rig and lift the machine�����
Ensure that the crane capacity, loading surfaces and straps are sufficient
to withstand the machine weight����� See the serial plate for the machine
weight�����
Ensure that the platform is unloaded and that all material and tools have
been removed�����
Begin with the platform fully lowered and retracted. Be sure that the module doors are closed
and secure. Remove all loose items from the machine.
Secure the Material Loading Gates and the Personnel Entry Gate in open positions.
ART_4179
Use the Platform Slide function to slide the platform forward approximately 18 inches (46 cm).
Use the ratcheting tie-down straps to secure the corners of the platform.
ART_4247
Tie-Down
Strap
Slide forward
18 in. (46 cm)
1.
2.
3.