![Mec Titan Boom 60-S Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/mec/titan-boom-60-s/titan-boom-60-s_operators-manual_1758607054.webp)
Page 50
Ttan Boom
TM
60-S - Operator’s Manual
September 2020
Transport and Lifting Instructions
Safety Information
This section is provided for reference and does not supersede any
government or company policy regarding the loading, transport or lifting
of MEC machinery�����
Truck drivers are responsible for loading and securing machines, and
should be properly trained and authorized to operate MEC machinery�����
Drivers are also responsible for selecting the correct and appropriate
trailer according to government regulations and company policy����� Drivers
must ensure that the vehicle and chains are strong enough to hold the
weight of the machine (see the serial number plate for machine weight)�����
Loading
Free-wheel configuration for Winching or Towing
RUNAWAY HAZARD!
After releasing the brakes there is nothing to stop machine travel�����
Machine will roll freely on slopes�����
ALWAYS chock the wheels before manually releasing the brakes�����
The machine can be winched or towed short distances at speeds not to exceed 5 MPH (8 km/h).
Before towing or winching the machine, it is necessary to release the brakes. Reset the brakes after
towing or winching.
DISENGAGED
ENGAGED
ART_2848
Disengage Brakes before Towing or Winching
Chock the wheels.
Remove the Torque Engage Cap and reinstall with the bump facing
inward on all four (4) hubs.
Engage Brakes before Driving
Remove the Torque Engage Cap and reinstall with the bump facing
outward on all four (4) hubs.
•
•
•
Transport and Lifting Instructions
Secton 12 - Transport and Lftng Instructons