Technical Manual – IP Router SCN-IP100.03
MDT technologies GmbH •
51766 Engelskirchen • Papiermühle 1
Tel.: +49-2263-
880 • Fax: +49-2263-4588 • [email protected] • www.mdt.de
34
34
4.7.2 Procedure ETS 5
Select „Interfaces“ in menu „Bus“:
Figure 21: ETS5 - Bus - Interfaces
Here the IP Router should be listed in the “Discovered connections”:
Figure 22: ETS5 - Discovered connections
After selecting the IP Router/IP Interface press button “Test”. If
OK
you can press button “Select”.
Now device is shown as “Current Interface”
For the selected IP router / IP interface, the first tunneling connection can then be set:
Figure 23: ETS5 – IP Tunneling connection