Procedure for insulation resistance measurement referred to the previous picture:
Switch situation
Point under test
Measurement result
Judgement on the
installation
1
Turn the switch A,
D and E off
Perform the
measurement on switch
A
Se R
≥
R
LIMITE
☺
OK
(end of the test)
Se R
<
R
LIMITE
Proceed
2
2
Turn the switch B
off
Perform the
measurement on switch
A
Se R
≥
R
LIMITE
Proceed
3
Se R
<
R
LIMITE
INSTALLATION
NOT COMPLYING
WITH STANDARDS
3
Perform the
measurement on switch
B
Se R
≥
R
LIMITE
☺
OK
(end of the test)
Se R
<
R
LIMITE
Proceed
4
4
Turn the switch C
off
Perform the
measurement on switch
B
Se R
≥
R
LIMITE
Proceed
5
Se R
<
R
LIMITE
INSTALLATION
NOT COMPLYING
WITH STANDARDS
5
Perform the
measurement on switch
C
Se R
≥
R
LIMITE
☺
OK
(end of the test)
Se R
<
R
LIMITE
INSTALLATION
NOT COMPLYING
WITH STANDARDS
Table5:
Table with procedure steps for insulation measurement referred to the
installation reported in Insulation measurements on an installation.
Note
The switches D and E are those installed near the load having the purpose of
separating it from the installation. In case the above said RCDs do not exist it is
necessary to disconnect the users from the installation before performing the
insulation resistance test.
ATTENTION:
If the installation includes electronic devices, disconnect them from the installation and
in case this is impossible only the test "a” is to be performed, that is to say between
active conductors (which in this case SHALL be connected together) and the earth.