© 2012 Magnum Energy, Inc.
7
2.0 Installation
2.5 Power-up Self Test
Info:
All power to operate the remote control is provided by the
inverter/charger through the remote cable.
When the ME-ARC is first connected to an inverter, a power-up self test is
initialized. During the self test, the LCD automatically displays in sequence:
• “
MAGNUM ENERGY Self Test”
, then
•
“(C) 2010-2012, Connecting to...”,
and then
•
“ME-ARC V 3.0, INV/CHG V #.#”
The remote’s LEDs also change with the screens (see Figure 2-7).
FAULT
PWR
CHG
INV
MAGNUM ENERGY
Self Test
FAULT
PWR
CHG
INV
(C)2010-2012
Connecting to..
FAULT
PWR
CHG
INV
ME-ARC V 3.0
INV/CHG V #.#
No LEDs light
PWR lights green
FAULT lights red
CHG lights green
INV lights green
CHG lights green
INV lights green
After the self test is finished the remote displays “
Set Clock”
.Use the ME-ARC’s
SELECT knob to set the correct time by selecting hour, minutes, and either
AM or PM (See Figure 2-8 below, and the Set Clock procedure on page 22).
Figure 2-7, Power-up Self Test Screens
Set Clock
AM-PM
=
12:00
A
Set Clock
Minute =
12:
12
A
Set Clock
Hour
= 12
:00A
Figure 2-8, Self Test Set Clock Screens