130
3.12 CRANE OPERATION POSTURE
To proceed to crane operation from the state described in
“Operation 3.11 Operation Before Crane Work”, move the
crane into a working posture as follows.
1. Operate the right work equipment operation lever (3) to
the “HOIST” side (pull toward you) to hoist the hook
block.
At this time, do not over-hoist the hook block.
If over-hoisted, the hook block is in a state of being
over-hoisted.
2. Operate the right work equipment operation lever (3) to
“LOWER” side (push to the right side) to lower the boom.
At this time, be careful not to allow the hook block to fall
sideways on the ground.
3. Repeat the operation in steps 1 and 2 and put the
machine into the work posture shown in the right figure.
Содержание CC423S-1
Страница 2: ......
Страница 8: ...vi This Page Intentionally Left Blank...
Страница 22: ...14 This Page Intentionally Left Blank...
Страница 56: ...48 SAFETY LABEL LOCATIONS 2 2...
Страница 59: ...51 24 Machine Mass 542 4773100 28 Working Radius Rated Total Load Chart 542 3582200...
Страница 60: ...52 30 Safe Operation 557 3494500 31 Operating the Moment Limiter 542 2250000...
Страница 194: ...186 This Page Intentionally Left Blank...
Страница 232: ...224...
Страница 248: ...240 This Page Intentionally Left Blank...
Страница 251: ...243 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 255: ...247 4 WORKING RADIUS LIFTING HEIGHT 4 Fall Wire Rope...
Страница 256: ...248 This Page Intentionally Left Blank...
Страница 262: ...254 3 MONITOR INDICATION 1 Searcher hook selector switch 2 Searcher hook position display...
Страница 276: ......
Страница 277: ......
Страница 278: ......