![Maeda CC423S-1 Скачать руководство пользователя страница 137](http://html1.mh-extra.com/html/maeda/cc423s-1/cc423s-1_operation-manual_3362941137.webp)
129
4. Operate the right work equipment operation lever (3) to
“RAISE” side (pull toward you) to raise the boom.
5. Repeat the operation in steps 3 and 4 and slowly raise the
boom until the hook block (4) is placed at the position
where it is perpendicular to the stowage section in the
front of the revolving super structure.
If the hook block (4) is detached from the stowage
rope (5) without the boom being raised near the
stowage position, the hook block (4) sways
considerably, which may not only damage the
peripheral equipment but also cause serious
physical injury.
6. Remove the hook block (4) from the rope for stowage (5).
7. Securely hitch the rope for stowage (5) on the rope hook
(6).
NOTES
At this time, be careful not to allow the hook block (4) and
rope for stowage (5) to be overtightened. If the rope for
stowage (5) is overtightened, lower the hook block (4).
Содержание CC423S-1
Страница 2: ......
Страница 8: ...vi This Page Intentionally Left Blank...
Страница 22: ...14 This Page Intentionally Left Blank...
Страница 56: ...48 SAFETY LABEL LOCATIONS 2 2...
Страница 59: ...51 24 Machine Mass 542 4773100 28 Working Radius Rated Total Load Chart 542 3582200...
Страница 60: ...52 30 Safe Operation 557 3494500 31 Operating the Moment Limiter 542 2250000...
Страница 194: ...186 This Page Intentionally Left Blank...
Страница 232: ...224...
Страница 248: ...240 This Page Intentionally Left Blank...
Страница 251: ...243 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 255: ...247 4 WORKING RADIUS LIFTING HEIGHT 4 Fall Wire Rope...
Страница 256: ...248 This Page Intentionally Left Blank...
Страница 262: ...254 3 MONITOR INDICATION 1 Searcher hook selector switch 2 Searcher hook position display...
Страница 276: ......
Страница 277: ......
Страница 278: ......