117
3.5 BREAK-IN OPERATION
Perform break-in for the period of the first approximately “100 hours” (hours displayed on the
service meter).
The performance and life of the machine are adversely affected if overloaded operation or task
is performed before the various sections of the machine are used to the operation.
While this machine is shipped after thorough adjustment and inspection, immediate difficult tasks will
quickly degrade the functions and shorten the life of the engine and crane.
Perform break-in for a period of the first approximately “100 hours” (time displayed on the service meter).
Pay attention particularly to the following during the break-in period.
• After the engine has started, be sure to perform the warm-up operations for the engine and hydraulic
equipment as described in “Operation 3.3 Operations and Checks after Starting Engine”.
• Perform the warm-up operation for 5 minutes after the engine has started.
• Avoid overloaded operation or tasks with high-speed operation.
• Avoid sudden starting, sudden acceleration, unnecessary sudden stop or sudden steering.
Содержание CC423S-1
Страница 2: ......
Страница 8: ...vi This Page Intentionally Left Blank...
Страница 22: ...14 This Page Intentionally Left Blank...
Страница 56: ...48 SAFETY LABEL LOCATIONS 2 2...
Страница 59: ...51 24 Machine Mass 542 4773100 28 Working Radius Rated Total Load Chart 542 3582200...
Страница 60: ...52 30 Safe Operation 557 3494500 31 Operating the Moment Limiter 542 2250000...
Страница 194: ...186 This Page Intentionally Left Blank...
Страница 232: ...224...
Страница 248: ...240 This Page Intentionally Left Blank...
Страница 251: ...243 2 SPECIFICATION DIMENSIONAL DRAWING...
Страница 255: ...247 4 WORKING RADIUS LIFTING HEIGHT 4 Fall Wire Rope...
Страница 256: ...248 This Page Intentionally Left Blank...
Страница 262: ...254 3 MONITOR INDICATION 1 Searcher hook selector switch 2 Searcher hook position display...
Страница 276: ......
Страница 277: ......
Страница 278: ......