241
The gas inlet on the new appliances is
equipped with a parallel thread ISO 228-1.
To assemble it, follow stages 3, 4, 5, and
6 as described below.
Precautions to take:
• the flexible pipe must be mounted so
that it will not be subjected to mechani-
cal stresses, such as being twisted,
compressed or pulled;
• the flexible pipe must be fitted so that it
will not come into contact with any
other movable piece of furniture;
• it must have a bending radius of at
least ten times its outside diameter;
• it must not come into contact with any
hot surfaces;
• ensure that it is installed in a place with
easy access, so that its entire length
can be checked.
• it should not be located in an overhe-
ated environment. and must be protec-
ted from sunlight and ultraviolet rays
Periodical checks and replace-
ment
The gas connection pipe must be chec-
ked at least annually to ensure that there
is no visible deterioration. The hose must
be replaced no later than the replace-
ment date indicated.
IMPORTANT:
Take the precaution of using two keys
when screwing up the components. (fig.
9.5).
After connecting the gas, use a soapy
solution to check that the connections
are sealed tight, and never use an
open flame.
Fig. 9.5