®
GRAFIK Eye
®
QS Control Unit Installation and Operation Guide 6
Wiring the GRAFIK Eye
®
QS Control Unit (continued)
Line Voltage Wiring Details
Step 4: Connect line voltage and loads
to control unit.
• Strip
9
in (8 mm) of insulation off the line
voltage/mains cables in the wallbox.
• Connect the line voltage/mains, ground,
and load wires to the appropriate
terminals on the back of the control unit.
L:
Hot/Live
N:
Neutral
: Ground
Terminals 1-6: Dimmed/Switched
line voltage outputs
9
in
(8 mm)
The recommended installation torque is
5.0 in∙lb (0.6 N∙m) for line voltage/mains
connections and 5.0 in∙lb (0.6 N∙m) for
the earth/ground connection.
Note:
See the zone setup section for a
list of compatible load types and
instructions for programming the
GRAFIK Eye
®
QS control unit to
properly recognize them.
Notice: Risk of damage to unit.
GRAFIK Eye
®
QS control units must be in stalled by a
qual i fied electrician in accordance with all applica ble reg u la tions and building codes.
Im prop er wiring can result in dam age to control units or oth er equipment.
Note:
To avoid over heat ing and pos si ble damage to equipment, do not install control
units to dim re cep ta cles, mo tor-op erated ap pli ances, or flu o res cent lighting not
equipped with Lutron
R
Hi-lume
®
, Eco-10
®
, Tu-Wire
®
, electron ic dim ming ballasts, or
other devices approved for your location. In dimmed mag net ic low-voltage cir cuits,
you can pre vent trans former overheating and failure by avoid ing excessively high
current flow. Do not op erate control units with any lamps re moved or burned out;
re place any burned out lamps imme di ate ly; use only transform ers that in cor po rate
thermal pro tection or fused pri ma ry wind ings. Control units are de signed for res i den tial
and commercial use, for indoor use only.