8
Step by Step instructions for GRAFIK Eye Dimming Panel
Feed and Load Wiring
Temporary Lighting
You do not need to install a temporary distribution panel. Place load
wires into the appropriate terminal blocks.
Each Input Breaker can supply power to a load while the bypass
jumper protects the dimmer from load faults.
Caution
!
GP panels require entry of wires as specified.
Improper entry will block serviceable parts, and impede
air flow through the panel.
Caution!
Common Neutrals are not permitted.
Run separate Neutrals for each load circuit.
DH
H
SH
Input circuit breaker
Bypass jumper protects
the dimmer from load
faults.
STEP 4: Feed and Load Wiring
(continued)
Feed Wiring (Mains Voltage Wiring)
IMPORTANT!
Panel
GP3 (277 V)
GP3 (120 V, 230 V)
GP4
GP8 through 24 Main Lugs
GP 8 through 24 Main Breaker
Load Circuit Wiring
Panel
GP3, 4
GP8 through 24
Wire Size
1 or 2
#10 AWG - #14 AWG
#6 AWG (10 mm
2
) - #14 AWG (1.0 mm
2
)
#10 AWG (4 mm
2
) - #14 AWG (1.0 mm
2
)
#2/0 AWG (50 mm
2
) - #14 AWG (1.0 mm
2
)
see rating on breaker
Wire Size
#10 AWG (4mm
2
) - #14 AWG (1.0mm
2
)
#10 AWG (4mm
2
) - #14 AWG (1.0mm
2
)
Where to Enter Panel
Bottom
Right of Panel (Bottom or Side Entry)
Bottom Right of Panel (Bottom or Side Entry
Bottom Right of Panel (Bottom or Side Entry
Top left of Panel (Top entry only)
Top left of Panel (Top entry only)
Where to Enter Panel
Bottom Left of Panel (Bottom or Side Entry)
Top Right of Panel (Top Entry Only)