5
Cable
6
Captive screw
7
Nut
8
Fillister head screw
9
Inner ferrule
10
Conductor
Crimp Ferrule Assembly
............................................................................................................................................................
1
Slide the outer ferrule over the cable.
............................................................................................................................................................
2
Strip the cable sheath from the end of the braid. For strip lengths see
table.
............................................................................................................................................................
3
Cut away approximately 13 mm of the braid from the end of the cable
sheath.
............................................................................................................................................................
4
Flare the braid and slide the inner ferrule under it. Do not unwave the
braid.Make sure that the inner ferrule butts against the cable sheath.
............................................................................................................................................................
5
Slide the outer ferrule over the inner ferrule.
............................................................................................................................................................
6
Place the cable assembly into the crimping tool.
............................................................................................................................................................
7
Crimp the ferrules, and remove the crimped assembly from the
crimping dies. Trim the excess braid from the two ferrules.
............................................................................................................................................................
8
Terminate the conductors to the contacts.
............................................................................................................................................................
9
Position one half of the cable clamp on the cable and the connector.
Ensure that the flange of connector is behind flange gripper of the
clamp and that the inner ferrule is positioned between the two
strain-relief bars of the clamp.
............................................................................................................................................................
10
Position the captive screws and the other half of the clamp on top of
cable and secure with fastening hardware.
Mounting of the Shielded Cable Hood for a
D-SUB Connector
Assembly Instructions
....................................................................................................................................................................................................................................
A - 8
Lucent Technologies - Proprietary
See notice on first page
365-312-761
Issue 1, May 2004
E
N D
O F
S
T E P S
............................................................................................................................................................