![Lucent Technologies IP-GE/2 Скачать руководство пользователя страница 53](http://html.mh-extra.com/html/lucent-technologies/ip-ge-2/ip-ge-2_installation-manual_1946302053.webp)
3
Arrangements
Overview
....................................................................................................................................................................................................................................
Purpose
This chapter covers the positions and the arrangements of the
connectors and paddle boards on the subrack and on the
interconnection panel. An example of the routing of external cabling
is also given.
Contents
1.5 Mbps Connector Arrangement
34/45 Mbps Connector Arrangement
34/45 Mbps Protected Connector Arrangement
155 Mbps Connector Arrangement
155 Mbps Protected Connector Arrangement
Optical Patch panel Connector Arrangement
....................................................................................................................................................................................................................................
365-312-761
Issue 1, May 2004
Lucent Technologies - Proprietary
See notice on first page
3 - 1