![Lucent Technologies IP-GE/2 Скачать руководство пользователя страница 37](http://html.mh-extra.com/html/lucent-technologies/ip-ge-2/ip-ge-2_installation-manual_1946302037.webp)
............................................................................................................................................................
6
Install the nut retainers according to the configuration of access and
rack type, see “Subrack Measurement” (1-14).
Reference:
The subracks can be mounted as follows:
•
within 300mm rack frames only at the
front
side.
•
within 600mm rack frames at both
front or/and rear
side
(called:
back-to-back
)
..........................................................................................................................................................
7
Slide the subrack into
the rack frame and
mount the subrack
according to its
configuration position
for .....
at .....
300mm rack frames
the front.
600mm rack frames
the front for front mounting or/and at
the rear for rear mounting positions.
............................................................................................................................................................
8
Place the “Units and Interface Paddle-Boards” (2-10) in the right
configuration positions according to the configuration.
............................................................................................................................................................
9
Feed the fiber cables through the cable ducts and connect the cables
according to the configuration.
•
•
“Gigabit-Ethernet Interfaces” (5-55)
............................................................................................................................................................
10
“Mounting of the Optical Patch Panel/Cables” (2-14)and route the
“Optical Patch Panel” (5-56) connections
............................................................................................................................................................
11
Install the internal/external interconnection cables.
•
“DC Power and Grounding” (5-6)
•
•
Clock interfaces:
-
-
•
“Miscellaneous Discrete Interface” (5-14)
•
“Office-Alarm Interface” (5-18)