Installing the Inverter
28
Step 2 Ground Connection
Remove the terminal cover(s) and cable guide. Then follow the instructions below to install
the ground connection for the inverter.
1
Locate the ground terminal and connect an appropriately rated ground cable to the
terminals. Refer to
specification for your installation.
0.75
–30 kW (3-Phase) 37–90 kW (3-Phase)
110~185kW (3-Phase) 220-250kW (3-Phase)
Содержание H100 0008-2(PLUS)
Страница 26: ......
Страница 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Страница 48: ...Installing the Inverter 22 ...
Страница 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Страница 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Страница 238: ...212 ...
Страница 239: ...213 목차 ...