Table of Functions
150
Code
(Comm.
Address)
Name
LCD
Display
Setting Range
Initial Value
Prop
erty*
Ref.
4
Int485
5
Fieldbus
7
Pulse
8
V3
9
I3
AP4-32
(0h1C20)
Flow rate monitor
Flow Rate
Mon
-
0.00
X
AP4-33
(0h1C21)
Turbine Input
Scaling
Turbine
Scale
0
–30000
0
O
AP4-34
(0h1C22)
Flow Unit 0%
Flow Unit
0%
0
–30000
0
O
AP4-35
(0h1C23)
Flow Unit 100%
Flow Unit
100%
0
–30000
10000
O
AP4-36
(0h1C24)
Flow Unit Selection
Flow Unit
Sel
0
gl/m
0: gl/m
O
1
gl/h
2
f3/m
3
m3/h
AP4-37
(0h1C25)
Flow Decimal Scale
Flow Dec
Scale
0
x 100
2: x1
O
1
x 10
2
x 1
3
x 0.1
4
x 0.01
AP4-38
(0h1C26)
Accumulation Level
-
Millions
AccumLvM
illion
0
–65535
0
O
AP4-39
(0h1C27)
Accumulation Level
-
Thousands
AccumLvT
hou
0
–999
0
AP4-40
(0h1C28)
Accumulation Level
-
Ones
AccumLvO
nes
0
–9999
0
O
Содержание H100 0008-2(PLUS)
Страница 26: ......
Страница 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Страница 48: ...Installing the Inverter 22 ...
Страница 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Страница 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Страница 238: ...212 ...
Страница 239: ...213 목차 ...