Preparing the Installation
13
Note
•
The vent covers must be removed for side-by-side installations.
•
Side-by-side installation cannot be used for the H100+ inverters rated for 37 kW and
above.
•
For the H100+ inverters rated for 37 kW and above, if the installation site satisfies the
UL Open Type requirements and there is no danger of foreign objects getting inside the
inverter and causing trouble, the vent cover may be removed to improve cooling
efficiency.
•
If you are installing multiple inverters of different ratings, provide sufficient clearance to
meet the clearance specifications of the larger inverter.The H100+ inverters rated for up
to 30 kW may be installed side-by-side.
Содержание H100 0008-2(PLUS)
Страница 26: ......
Страница 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Страница 48: ...Installing the Inverter 22 ...
Страница 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Страница 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Страница 238: ...212 ...
Страница 239: ...213 목차 ...