41
Installing
the Inverter
Step 5 PNP/NPN Mode Selection
The H100+ inverter supports both PNP (Source) and NPN (Sink) modes for sequence
inputs at the terminal. Select an appropriate mode to suit requirements using the PNP/NPN
selection switch (SW2) on the control board. Refer to the following information for detailed
applications.
PNP Mode (Source)
Select PNP using the PNP/NPN selection switch (SW2). Note that the factory default
setting is NPN mode. CM is the common ground terminal for all analog inputs at the
terminal, and P24 is 24 V internal source. If you are using an external 24 V source, build a
circuit that connects the external source (-) and the CM terminal.
NPN Mode (Sink)
Select NPN using the PNP/NPN selection switch (SW2). Note that the factory default
setting is NPN mode. CM is the common ground terminal for all analog inputs at the
terminal, and P24 is 24 V internal source.
Содержание H100 0008-2(PLUS)
Страница 26: ......
Страница 30: ...Preparing the Installation 4 37 90 kW 3 Phase ...
Страница 31: ...Preparing the Installation 5 110 132 kW 3 Phase ...
Страница 32: ...Preparing the Installation 6 160 185 kW 3 Phase ...
Страница 33: ...Preparing the Installation 7 220 250 kW 3 Phase ...
Страница 34: ...Preparing the Installation 8 315 400 kW 3 Phase ...
Страница 35: ...Preparing the Installation 9 500 kW 3 Phase ...
Страница 46: ...Installing the Inverter 20 200 V 0 75 18 5kW 400 V 0 75 185kW 400 V 220 500kW ...
Страница 48: ...Installing the Inverter 22 ...
Страница 63: ...37 Installing the Inverter Input and Output Control Terminal Block Wiring Diagram ...
Страница 207: ...Technical Specification 181 6 3 External Dimensions 0 75 30 kW 3 phase 37 90 kW 3 phase ...
Страница 208: ...Technical Specification 182 110 185 kW 3 phase 220 500 kW 3 phase ...
Страница 237: ...211 목차 EN IEC 61800 3 2018 EN 61800 5 1 2007 A1 2017 ...
Страница 238: ...212 ...
Страница 239: ...213 목차 ...