Group 6
Operation – Elements and procedures
Page 55
Release R1.03e
LEIBINGER JET3
6.4.2 First initialization of the device
After connection to the mains power or after a power interruption, the initialization
of the device will be carried out automatically. For this procedure the boot-manager
is started. The progress of the initialization is shown by a bar. After finishing the
process the device is switched to the standby-mode (monitor is dark) and the JET3
is now ready to switch on by pressing the touch screen.
Figure 18
Initialization process
1 – Bootmanager
2 – Progress display
6.4.3 Switch on device
6.4.3.1 Switching on without password protection
Proceeding:
Touch the dark
Touch-Display
(1) at any point. Period of touching approx. 2
sec..
The device turns on and the main menu (2) is displayed with the message
<Initialization>
(3).
After the initialization the device starts with the bleeding of the system
automatically.
During the process the message
<Bleeding>
(4) is displayed. The bleeding
takes between 1 – 5 min. The process can be canceled by pressing the button
<Cancel>
(5).
Note:
For starting the device the job which has been used at last will be loaded
automatically.
3
2
Содержание JET3
Страница 16: ...Group 2 Safety instructions Page 16 Release R1 03e LEIBINGER JET3 2 4 Safety sticker Figure 1 Safety sticker ...
Страница 217: ...Group 12 Appendix Page 217 Release R1 03e LEIBINGER JET3 Interface X3 Outputs ...
Страница 223: ...Group 12 Appendix Page 223 Release R1 03e LEIBINGER JET3 12 3 2 Cabinet LJ3 Cabinet cpl LJ3 ...