Group 5
Transport/Start up
Page 29
Release R1.03e
LEIBINGER JET3
5.3 Installation
For adaption to the production line several works have to be carried out and operating
parameters have to be set before start of operation.
5.3.1 Mains supply
Mains supply!
The device does not have a mains switch and should be only
connected to a socket close to the installation location!
The LEIBINGER JET3 should be connected to AC voltage 100 - 240 V AC, 50 – 60
Hz with an appropriate plug.
The socket should be provided with a clear designation
(e.g.: JET3).
After connecting to the mains power supply the initialization of the device will be
carried out automatically. After this process the JET3 is ready for operation.
You will find further information regarding the initialization in the
Chapter
Initialization of device
!
Содержание JET3
Страница 16: ...Group 2 Safety instructions Page 16 Release R1 03e LEIBINGER JET3 2 4 Safety sticker Figure 1 Safety sticker ...
Страница 217: ...Group 12 Appendix Page 217 Release R1 03e LEIBINGER JET3 Interface X3 Outputs ...
Страница 223: ...Group 12 Appendix Page 223 Release R1 03e LEIBINGER JET3 12 3 2 Cabinet LJ3 Cabinet cpl LJ3 ...