Transportation
Accident prevention!
The equipment may only be transported with sufficient means of transportation.
It must be fixed securely during transportation. Avoid knocks to the equipment.
The equipment can be moved on a pallet to in-plant transport via an elevating platform truck or forklift truck.
When moving the equipment mind the weight to prevent it from tipping or rolling.
• When moving the equipment keep the lifting height as low as possible.
• When moving the equipment pay attention that all electrical and pneumatic connections (also to the wiring
harness and if required, reserve air storage tank) are disconnected.
• Observe the safety regulations for handling the elevating platform truck or forklift truck when moving equip-
ment.
Storage
General information on storage
• If the equipment is not installed and started up immediately, it must be stored under appropriate storage
conditions in a dry, dust and frost-free indoor area, protected from sunlight.
• The equipment should be wrapped in plastic or foil packaging.
• The storage time should not exceed one year.
Functionality of pressurization system RTS 1000D, RTS 2600D und RTS
5200D
The compressor draws in external air and compresses this to approx. 7 bar. Then the compressed air is chan-
nelled in the air dryer, alternatively by two drying agent containers, in which the air is dehumidified. In doing
so, the air is only dried in one drying agent container, while at the same time in another drying agent container
the existing drying agent is regenerated by a branch current of the already dried air. The humid regeneration air
is collected in the condensate surge tank.
The air dried in this way is stored in the air storage tank with a pressure between 3.0 and 5.5 bar. A pressure
monitor ensures sufficient compressed air in the air storage tank, in which it switches the compressor on and
off. The existing air pressure in the air storage tank can be read on the "high pressure" manometer.
A built-in air regulator reduces the stored compressed air from the air storage tank to the required cable pres-
sure. This can be read on the "cable pressure" manometer.
This pressure-reduced air reaches the distribution device of the connected cable network via an shut-off valve
and an injector. In order to guarantee proper operation the dried compressed air is constantly checked for its
humidity content in the humidity monitoring unit. If the relative air humidity rises over 4%, the compressor is
switched off. A signal "F" is generated.
The pressure in the air storage tank is constantly monitored. If this rises to 7.0 bar, the pressure is blown off
via a safety valve.
Likewise, the pressure conducted to the distribution devices is constantly monitored. If this exceeds the set
cable pressure by 0.2 bar, the pressure is blown off via a safety valve. If the pressure drops by 0.2 bar below
the set cable pressure, a pressure switch activates the signal "N".
The equipment runs fully automatically after startup. Operational upsets are displayed on the mulit functional
relay (MFR) and the minidisplay at the display panel. In addition these fault signals are relayed to an external
control centre.
The MFR distributes the drying and regenerating processes evenly to both drying containers by means of the
solenoid valves. So none of them will be flooded, when only little amounts of air are produced.
The solenoid valves also allow for unpressurised compressor starts.
Содержание RTS 1000D
Страница 43: ...Page 43 Compressor VD 7 2 RTS 1000D and VD 28 2 RTS 2600D B...
Страница 45: ...Page 45 Compressor VD 50 4 RTS 5200D...
Страница 57: ...Compressor VD 7 2 and VD 28 2 Page 57...
Страница 59: ...Page 59 Compressor VD 50 4...
Страница 61: ...Page 61 Pneumatics diagram RTS 1000D RTS 2600D and RTS 5200D no 073445 072...
Страница 63: ...Page 63 Circuit and wiring diagram RTS 1000D RTS 2600D und RTS 5200D no 073659 000...
Страница 65: ...Page 65 Circuit and wiring diagram RTS 1000D RTS 2600D und RTS 5200D no 073586 000...
Страница 66: ...Page 66...
Страница 67: ...Page 67...