![LANCIER Monitoring RTS 1000D Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/lancier-monitoring/rts-1000d/rts-1000d_operating-instructions-manual_3471353047.webp)
Page 47
3. Servicing double non-return valve
3.1 Dismantle double non-return valve (35)
• Unscrew all hose lines from double non-return valve (
35
).
• Unscrew double non-return valve (
35
) and remove from equipment.
3.2 Disassemble double non-return valve
(
35
)
• Unscrew valve seats (
100
) on both sides.
• Take out both pistons (
102
) with the inside spring (
103
).
3.3 Clean double non-return valve
(
35
)
• Dry clean all parts
• Clean injectors (
104
).
• Replace worn seals (
101
), (
105
).
3.4 Assemble double non-return valve
(
35
)
• Screw in a valve seat (
100
) again.
• Insert pistons (
102
) and springs (
103
).
• Screw in second valve seat (
100
).
100 104/105 103 102
35
101
3.5 Mount double non-return valve
(
35
)
• Screw double non-return valve (
35
) again in the equipment.
• Screw all hose lines again onto the double non-return valve.
4. Servicing pressure limiting valve and micro filter
4.1 Remove pressure limiting valve (34)
• Unscrew all hose lines from pressure limiting valve (
34
).
• Unscrew knurled nut and take out pressure limiting valve (
46
).
4.2 Disassemble pressure limiting valve (34)
• Pull back plastic cap (
106
) for release and turn anti-clock-
wise as far as it will go, to relieve the valve.
• Unscrew upper housing (
107
) from base part (
108
).
• Take out setting screw (
109
), spring (
110
) and pressure
plate (
111
) from upper housing.
• Remove plastic sealing ring (
112
) and membrane (
113
)
carefully from the housing base part (
108
).
Warning: Do not damage membrane with sharp objects
when removing.
4.3 Clean pressure limiting valve (34)
• Dry clean all parts.
106
107
109 110 111 112 113 108
• Replace worn membrane (
113
).
4.4 Assemble pressure limiting valve (34)
• Insert membrane (
113
) and plastic sealing ring (
112
) again into housing base (
108
).
• First insert setting screw (
109
) into upper housing (
107
) with the square end and put spring (
110
) over.
• Place pressure plate (
111
) with the flange on the spring (
110
) (the flat side lies on the membrane after
mounting).
• Screw together upper (
107
) and lower housing (
108
).
4.5 Mount pressure limiting valve (34)
• Reinsert pressure limiting valve (
34
) and tighten with knurled nut.
• Screw on all hose lines again to pressure limiting valve (
34
).
5. Servicing micro filter
5.1 Change micro filter element (96) of micro filter (33)
see page 40.
Important!
After mounting, reset pressure limiting valve correctly
(see page 29)!
Содержание RTS 1000D
Страница 43: ...Page 43 Compressor VD 7 2 RTS 1000D and VD 28 2 RTS 2600D B...
Страница 45: ...Page 45 Compressor VD 50 4 RTS 5200D...
Страница 57: ...Compressor VD 7 2 and VD 28 2 Page 57...
Страница 59: ...Page 59 Compressor VD 50 4...
Страница 61: ...Page 61 Pneumatics diagram RTS 1000D RTS 2600D and RTS 5200D no 073445 072...
Страница 63: ...Page 63 Circuit and wiring diagram RTS 1000D RTS 2600D und RTS 5200D no 073659 000...
Страница 65: ...Page 65 Circuit and wiring diagram RTS 1000D RTS 2600D und RTS 5200D no 073586 000...
Страница 66: ...Page 66...
Страница 67: ...Page 67...