Page 38
Servicing
General comments
• Follow the maintenance guidelines and intervals accurately, so that the equipment stays in sound operating
condition.
• The terms specified for maintenance intervals must be adhered to!
• Maintenance works may only be carried out by skilled personnel!
• Test air storage tank regularly in accordance with the regulation on pressure tanks!
• Allow system testing to be carried out regularly in accordance with DIN/VDE 0701/0702, BGV A2 (this testing
can also be commissioned at LANCIER-Monitoring).
• Only use original LANCIER Monitoring replacement parts!
• After maintenance works tighten all loosened screw joints again!
• The individual operating elements (
figures in brackets
) are described in full in the preceding chapters and
are no longer illustrated here
Maintenance interval every 400 operating hours
Deadly risk!
Working on open, live equipment!
• Do not operate the equipment with damp hands!
• Caution: live components!
1. Before servicing
• Open cabinet door.
• Close shut-off valve (
9
).
2. Interrupt signal output
(RTS 2600D and RTS 5200D equipped with optional door switch (
90
) only)
to avoid the forwarding of fault signalisation effected by
servicing works.
• Press button „signal interruption“ (
87
) of the door switch
(
90
).
- pusher (
88
) emerges,
- LED „signal interruption“ (
89
) illuminates in the MFR (
73
).
3. Test and if necessary set cable pressure
• The procedure is described in detail on
page 27
.
88
87
4. Test and set if necessary, function pressure monitor (36)
• The procedure is described in detail on
page 28
.
5. Clean air intake filter of the compressor (18)
Deadly risk!
Switch off operating voltage!
Risk of injury!
Caution with heated components!
Risk of injury!
Wear protective goggles when blowing out devices.
• Turn and pull filter cap (
91
) to the left (anti-clockwise).
• Pull out filter cartridge (
92
) and then blow with pressurised
air or beat it and wash out with water.
• Dry filter cartridge (
92
).
• Renew filter cartridge (
92
) in the case of heavy contamina-
tion.
• Insert filter cartridge (
92
).
• Put on filter cap (
91
) and turn right (clockwise).
• Carry out maintenance works on the other air intake filter.
92
91
6. Empty condensate surge container (76)
Содержание RTS 1000D
Страница 43: ...Page 43 Compressor VD 7 2 RTS 1000D and VD 28 2 RTS 2600D B...
Страница 45: ...Page 45 Compressor VD 50 4 RTS 5200D...
Страница 57: ...Compressor VD 7 2 and VD 28 2 Page 57...
Страница 59: ...Page 59 Compressor VD 50 4...
Страница 61: ...Page 61 Pneumatics diagram RTS 1000D RTS 2600D and RTS 5200D no 073445 072...
Страница 63: ...Page 63 Circuit and wiring diagram RTS 1000D RTS 2600D und RTS 5200D no 073659 000...
Страница 65: ...Page 65 Circuit and wiring diagram RTS 1000D RTS 2600D und RTS 5200D no 073586 000...
Страница 66: ...Page 66...
Страница 67: ...Page 67...