
A
C
B
B
A. Power Cord to Tower
B. Power Supply
Unit is designed to be supported by a remote chiller
system or remote ice cooled system. Please see the
manufacturer’s specifications and instructions for
installation. The following are instructions for
plumbing the remote chiller system.
NOTE
12.
Route appropriate tubing from the syrup pump location to
the syrup inlets at the remote chiller. Repeat for all syrup
connections.
13.
Route appropriate tubing from the water source to the water
inlet at the remote chiller and only connect tubing to the
water source.
14.
Turn on the water and flush the water line thoroughly.
15. Turn off the water and connect water line to the plain water
inlet at the remote chiller.
8
Dispenser Setup
1.
Remove the cup rest from drip tray.
2.
Remove the nozzle by twisting clockwise and pulling down.
3.
Remove the splash plate by placing both hands at the
bottom of the plate. Simultaneously lift up and pull out on
the splash plate until it ‘pops’ off of the front panel.
The minimum flowing pressure to the valve must be
20 PSI (0.137 MPA). A booster pump may be required
for proper operation of the valve.
!
ATTENTION
4. Twist the key-lock rod, located behind the splash plate, to
unlock the head of the tower.
5. Once unlocked, lift the head of the tower all the way then
lock the head of the tower in place by using the kick stand
next to the tower hinges.
A. Nozzle
A. Kickstand
B. Tower Hinges
C. Power Switch
A. Splash Plate
A. Key-Lock Rod
A
A
A
A
11. Plug in power cord to power supply then route power supply
cord to the designated grounded electrical outlet.
DO NOT PLUG UNIT INTO GROUNDED ELECTRICAL
OUTLET AT THIS TIME.
Make sure that all water lines
are tight and unit is dry before making any electrical
connections
!
WARNING