126
General Maintenance
2.
Slide the cylinder into position behind the packer through the clean-out trap.
3.
Align the cylinder with the front pin hole.
Figure 3
-
166 Cylinder aligned with front pin hole
4.
Reinstall the front cylinder pin and its 4 bolts (see Figure 3
162).
5.
Tighten all 4 bolts.
6.
Reconnect both hoses to the cylinder fittings. To do so:
6 a.
Place a bucket under the hoses to collect oil that may spill out.
6 b.
Remove the caps from the hoses and connect the hoses to the appropriate fittings.
Be careful to reconnect hoses to proper fittings. Use the identification method from Step 7
of the preceding procedure to help you with this task.
6 c.
Tighten both cylinder hose fittings.
Figure 3
-
167 Tightening hose fittings
Caution!
This task must be performed by 2 people.
Front pin hole
Содержание EXPERT
Страница 1: ...EXPERT TM MAINTENANCE MANUAL...
Страница 2: ......
Страница 3: ...EXPERT MAINTENANCE MANUAL...
Страница 10: ...viii Table of Contents...
Страница 18: ...8 Introduction...
Страница 244: ...234 General Maintenance...
Страница 251: ...Lubrication 241 Figure 4 11 Glass compartment lubrication chart optional...
Страница 252: ...242 Lubrication Figure 4 12 EXPERT lubrication chart...
Страница 261: ...Lubrication 251 Figure 4 27 Packer lubrication points 2 Grease fitting LH side front cylinder pin...
Страница 263: ...Lubrication 253 Pump Drive Shaft U Joint Figure 4 30 Pump drive shaft lubrication points Grease fittings...
Страница 264: ...254 Lubrication...
Страница 320: ...310 Hydraulic System...
Страница 357: ...Troubleshooting 349...
Страница 358: ...350 Troubleshooting...
Страница 386: ...378 Multiplexing...
Страница 388: ...380 Lifting Arms Figure 10 1 Mounting bolts Figure 10 2 Wear pads Figure 10 3 Helping Hand gripper...