6-38
Machine transportation after setup > Procedure for the main unit transportation (Truck transportation)
[CONFIDENTIAL]
23
Remove the treatment rear plate [A]. (Screw x2)
24
Move the main unit to the location to be installed, lay the floor plates and install the
main unit on the plates.
25
Open the front right upper cover [A] and the front left upper cover [B].
IMPORTANT
If forgetting to remove the treatment plate, C2100 will occur.
(After removing the fixing plate, it will recover by turning on the power switch.)
IMPORTANT
• Floor flatness: 0.3 degree or less (Inclination has to be less than 5 mm against main unit length 1,000 mm.)
• Load capacity: 350 kg/m2 or more
In order to keep the level and adjust it accurate, it is recommended that place firm plates or the panel
underneath of the main unit.
Содержание AK-9110
Страница 9: ...This page is intentionally left blank ...