3-175
Enhancement device setup procedure > Optional device installation
[CONFIDENTIAL]
114
Remove Bracket [A] (Screws x4). The screw will use in step 113. 2 Brackets [A] will
not be used again.
115
Attach connecting plate right [A] (Screws x4). Connecting plate right [A] was
assembled in step 110. Screw was removed in step 112.
Preparation for Bridge Kit for Stacker to Finisher (AK-9120)
116
Remove 3 Screw (Screw x3). The screws will not be used in this installation.
[A]
[A]
[A]
Содержание AK-9110
Страница 9: ...This page is intentionally left blank ...