6-3
Machine transportation after setup > Procedure for the main unit transportation (floor to floor)
[CONFIDENTIAL]
11
Release 2 hooks [B] from main unit [C], and then remove right exit tray [A] in the
direction of the arrow.
12
Open the front left lower cover [A].
13
Open the cleaning liquid tank cover [B] by rotating the lock lever [A] in the direction
of the arrow.
[A]
[A]
[B]
Содержание AK-9110
Страница 9: ...This page is intentionally left blank ...