6-6
Machine transportation after setup > Procedure for the main unit transportation (floor to floor)
[CONFIDENTIAL]
21
Close the waste ink tank cover [A] and lock by rotating the lock dial [B] in the
direction of the arrow.
22
Rotate the waste ink tank nozzle release dial [A] in the direction of the arrow.
23
Release the level bolts by rotating that are located bottom of the main unit with 19
mm wrench.
[A]
[B]
[A]
Содержание AK-9110
Страница 9: ...This page is intentionally left blank ...