3-166
Enhancement device setup procedure > Optional device installation
[CONFIDENTIAL]
Preparation for 5000 Sheet Stacker (ST-9100) (Upstream Unit)
84
Remove the left exit cover [A] from the left side of the unit (
x2).
85
Attach the joint bracket of the downstream unit on the left side of the high capacity
stacker, and then install the downstream unit. Use the screw holes circled below.
Preparation for ST-9100 (downstream Unit)
86
Remove all visible tapes from the external covers.
87
Open the front upper cover [A], and then remove all visible tapes.
IMPORTANT
• Do this procedure only if another peripheral device will be installed downstream.