3-81
Enhancement device setup procedure > Optional device installation
[CONFIDENTIAL]
<D> Paper Feeder (PF-9100) to Bridge Kit for Paper Feeder (AK-9130)
Preparation for Bridge kit for paper feeder (AK-9130)
99
Attach the joint bracket [A] provided with the upstream paper feeder to the right side
of the bridge kit (Screw x2).
100
Dock the upstream paper feeder. Insert the joint pin on the left side of the upstream
paper feeder into the hole in the joint bracket on the bridge kit.
101
Place the four leveling shoes [A] below the bolts [B] under each corner of the paper
feeder. Turn the nuts [B] to lower the bolt until the bolts reach the leveling shoes [A].
NOTE
• See
for unpacking.
Содержание AK-9110
Страница 9: ...This page is intentionally left blank ...