3-76
Enhancement device setup procedure > Optional device installation
[CONFIDENTIAL]
Preparation for PF-9100 (downstream unit)
89
Remove the six covers on the right side of the downstream paper feeder.
90
Attach the two joint brackets [A] provided with this option to the right side of the
downstream paper feeder (Screw x 2 each: M5x10).
Upper side
Lower side
Содержание AK-9110
Страница 9: ...This page is intentionally left blank ...