6-39
Machine transportation after setup > Procedure for the main unit transportation (Truck transportation)
[CONFIDENTIAL]
26
Remove the front left upper cover [A] in the direction of the arrow. (Screw x3)
27
Adjust the level with a leveler in the main unit by rotating the level bolts, with 19 mm
wrench, that are located bottom of the main unit.
Adjust them as all casters slightly up from the floor at the end.
Make sure to adjust the above because the main unit might move if the casters are not up slightly when clearing
the jam by moving the enhancement devices and locate it back to the original position due to pushing the main
unit by the enhancement devices.
Содержание AK-9110
Страница 9: ...This page is intentionally left blank ...