6. - Machine delivery
Venta 3030-3530-4030
41
RN034AGB D
Seed Drill
6.2.1 Unloading with an overhead crane
6.2.2 Unloading with a forklift
- To unload, use 3 slings.
- Fit 2 slings on the front parking stands.
- Fix a sling to the center at the level of the square
tube of the platform (1).
• 70 mm square tube (2.75’’)
1
Each sling must have a length of at least L:
•
L =
4.00 m (13’1’’)
Minimum capacity of the lifting system:
Minimum lift capacity: 2 t
- Insert the forks of the carriage into the casing of
the central holder.