9. - Instructions for work
Venta 3030-3530-4030
85
RN034AGB D
Seed Drill
Between the metering unit and the hopper base,
there is a hatch that stops the seeds from entering
the metering unit during transport or hopper filling.
- Remove tube clip (1).
- Open the gate valve.
- Insert and lock lynch pin.
1
- Lift and tip the calibration test flap (1).
The calibration test flap (1) is open.
1
- Remove the unit flow control bag on the left side of
the seed box.
Содержание Venta 3030
Страница 2: ......
Страница 28: ...Venta 3030 3530 4030 26 4 Safety RN034AGB D Seed Drill 6 7 ...
Страница 130: ...Venta 3030 3530 4030 128 13 Calculating the load on an axle RN034AGB D Seed Drill T Axle loads Tractor only T _____kg ...
Страница 135: ......