13. - Calculating the load on an axle
Venta 3030-3530-4030
125
RN034AGB D
Seed Drill
Front tool:
2) Calculation of the minimum rear ballast weight M2
minimum
Write the minimal additional weight in the chart.
M2
minimum =
M1 x a - T2 x b + 0.45 x T x b
b+c+d
3) Calculation of the actual load on the front axle T1
real
If the front tool (M1) is lighter than the minimum load required at the front (minimum), increase tool weight
until the required minimum front load is reached
Indicate front axle calculated load value and the one indicated in the tractor operators' manual.
T1
real =
M1 x (a+b) + T1 x b - M2 x (c+d)
b
4) Calculation of the total weight M
real
If the rear tool (M2) is lighter than the minimum load required at the rear(minimum), increase tool weight
until the required minimum rear load is reached
Indicate calculated total load value and the one authorized as indicated in the tractor operator's manual.
M
real = M1 + T + M2
5) Calculation of the actual rear axle load T2
real
Indicate rear axle calculated load value and the one indicated in the tractor operator's manual.
T2
real =
M
real -
T1
real
6) Tyre carrying capacity
Indicate double (2 tyres) the authorized load value (see tyre manufacturer indications).
Содержание Venta 3030
Страница 2: ......
Страница 28: ...Venta 3030 3530 4030 26 4 Safety RN034AGB D Seed Drill 6 7 ...
Страница 130: ...Venta 3030 3530 4030 128 13 Calculating the load on an axle RN034AGB D Seed Drill T Axle loads Tractor only T _____kg ...
Страница 135: ......