77
ASSEMBLY INSTRUCTIONS
9. Connect the 3rd function harness to the 3rd function
control lever harness, 3rd ON/OFF switch harness and
tractor harness. Clamp them with the cord bands.
A
In connecting the 3rd function harness and 3rd
function control lever harness, match the connector
colors.
A
With the harnesses secured with the cord bands,
move the relevant levers and make sure well that no
harness gets too tense nor stuck.
10. Pass the 3rd function harness behind the lever cables.
Then connect the harness to the 3rd valve, as shown
below.
A
Secure the earth harness in place. Adjust its angle
beforehand, as required, not to run over the valve bolt
as shown below.
11. Put the relays to the relay stay.
12. Using the cross-shaped clamps, secure the 3rd
function harness to the hoses, as shown below.
(1) 3rd function harness
(2) 3rd function control lever harness
(3) 3rd ON/OFF switch harness
(4) Tractor harness
(5) Cord band (140 mm (5.5 in.))
(Clamp with the lever cables)
(6) Cord band (140 mm (5.5 in.))
(Clamp with the tractor main harness)
(1) 3rd function harness
(2) 2-Lever cable
(3) Harness to solenoid valve
(4) Harness (to earth)
(5) M8 bolt (earth bolt)
(6) 3rd function valve
(1) Valve bolt
(A) Cable running over the
bolt (Not good)
(1) Relay stay
(2) Relay (with white connector)
(3) Relay (with black connector)