©Termo-tehnika, d.o.o.
ID.: 17-16-24-3006-03 | 12.2016
17
The clearances for the internal device are provided in the document
Installation Manual –
Hydro Module.
4.2.3 Levelling of the device
The external device must be levelled in the horizontal position as shown on the diagrams below:
4.2.4 Removal of side
Unscrew 3 screws of the side
Electrical and machine connections
Unscrew the screws marked with 1 on the front and right side of the device.
Pull down the lower part of the side (2) and open it towards you.
2
1
1