©Termo-tehnika, d.o.o.
ID.: 17-16-24-3006-03 | 12.2016
3
1.
Important information
5
1.1
Symbols
5
1.2
General
6
1.3
Safety warnings and instructions
6
1.4
Obligations of the manufacturer
9
1.5
Obligations of the installer during installation
9
1.6
Obligations of the authorised contractor for commissioning at first commission.
9
1.7
Obligations of the user
9
1.8
Factory testing
10
2.
Transport and installation of the device
10
2.1
Transport
10
2.2
Installation of the device
10
2.3
Storing and warehousing of the device
10
3.
Delivery package
11
3.1
The delivery package includes
11
3.2
Internal device
11
3.3
Package and worn-out device management
11
4.
Installation of the device
12
4.1
General
12
4.2
Location of the device
15
4.2.1
Set up and connection of the external sensor.
16
4.2.2
Minimal clearance from the device
16
4.2.3
Levelling of the device
17
4.2.4
Removal of side
17
4.2.5
Concrete pedestal
18
4.2.6
Wall penetration for the refrigerant and electro-communication connection
19
4.3
Refrigerant pipe connection of the exterior and interior device
19
4.3.1
Determining the length of the connection pipes
19
4.3.2
Pipe connection protection
21
4.3.3
Preparation of the refrigerant pipe
21
4.3.4
The execution of connecting the pipe-refrigerant connection on the exterior device 23
4.3.5
Leak test
25
4.3.6
Vacuuming of the system
26
4.3.7
The release of the refrigerant from the external device into the finished system
26
4.3.8
Condensate drainage
27
4.4
Electrical connection
28
4.5
Removal of the external device cover
29
4.6
Connecting the external unit
29
4.6.1
Power cable connection of the external unit
29
4.6.2
The connection of the plated communication cable to the external unit
31
4.7
Connecting the internal device
32
4.8
Spatial corrector
32
5.
Commissioning of the device
32
6.
Maintenance
32
6.1
Cleaning of the heat exchanger
33