©Termo-tehnika, d.o.o.
32
ID.: 17-16-24-3006-03 | 12.2016
The cables of the plated cable which you connect
to the connectors below, are given in brackets:
Not in use (4)
GND (3)
BUS – A (1)
BUS – B (2)
For connecting the plated communication cable of the internal unit, see:
Instructions for installing the Hydro module
4.7 Connecting the internal device
See:
Instructions for installing the Hydro module
4.8 Spatial corrector
See:
Instructions for installing and using KT-1
or
Instructions for installing and using KT-2
5.
Commissioning of the device
After professional installation, the authorised contractor has to perform the commissioning of the device.
CAUTION
The commission can only be performed by a person authorised by the manufacturer! If the
commission is performed by an unauthorised person, the warranty is not recognised.
Management of the device must be performed in accordance with current instructions for use.
6.
Maintenance
The device must be visually inspected once a year. The electrical and hardware installation of the device
as well as the state of the evaporator have to be inspected. In case irregularities and impurities are
detected on the evaporator or clotting of the channels between the lamellas, contact the authorised
maintenance worker to perform cleaning.
CAUTION
Before the commission it is necessary all the required tasks and inspections from the tasks
for commission.