
Settings
194
Pos: 34.10 /Überschriften/Überschriften 3/U-Z/Verbinden des Bindegarns untereinander @ 20\mod_1239009908472_78.docx @ 226926 @ @ 1
11.1.2
Interconnecting the twine (twine box)
Pos: 34.11 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Alte AusführungenDoppelknoter Fadenführung allgemein Big Pack 1270/1290/12130 @ 20\mod_1239023888628_78.docx @ 227723 @ @ 1
The 6 rolls in driving direction front (right hand and left hand machine side) provide for the
upper 3 twine strands (upper twine) and lead over the twine brakes (in the twine box) to the
upper twine brakes.
The 6 following twine rolls provide for the 3 lower twine strands (lower twine) and lead over the
twine brakes (in the twine box) to the lower twine brakes.
Each one upper twine and lower twine are lead to each knotter during the baling process.
Pos: 34.12 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Alte AusführungenVerbinden Bindegarn Bild BigPack 1270/1290/12130 Doppelknoter HS Baureihe @ 64\mod_1300289631906_78.docx @ 583142 @ 4 @ 1
Fig.133
Pos: 34.13 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/oberer Garnstrang (1) @ 20\mod_1239010309316_78.docx @ 227044 @ @ 1
upper twine strand (1)
Pos: 34.14 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Alte AusführungenBindegarn einlegen I,II Einfachknoter @ 20\mod_1239010466722_78.docx @ 227068 @ 2 @ 1
1
Lead the beginning of the twine of the twine roll (I) over the eye through the upper twine
brake (in the twine box).
2
Connect the end of the twine of twine roll (I) and the beginning of the twine of twine roll
(II) by a reef knot.
Pos: 34.15 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/unterer Garnstrang (2) @ 20\mod_1239010516503_78.docx @ 227093 @ 3 @ 1
lower twine strand (2)
Pos: 34.16 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Alte AusführungenBindegarn einlegen I,II Doppelknoter unterer Garnstrang @ 21\mod_1239090246665_78.docx @ 228659 @ 3 @ 1
1
Lead the beginning of the twine of the twine roll (I) over the eye through the lower twine
brake (in the twine box).
2
Connect the end of the twine of twine roll (I) and the beginning of the twine of twine roll
(II) by a reef knot.
Pos: 34.17 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Enden des Kreuzknotens kürzen @ 20\mod_1239016315956_78.docx @ 227545 @ 4 @ 1
3
Shorten the ends of the reef knot to x = 15 - 20 mm
Pos: 34.18 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Hinweis Reverserollen (R) @ 20\mod_1239010206160_78.docx @ 227020 @ @ 1
Note
The twine rolls (R) are auxiliary rolls. They must not be connected with other rolls.
Pos: 34.19 /BA/---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ 3 @ 1
Содержание Big Pack 4x4
Страница 331: ......