
Operation
187
Pos: 32.23 /Überschriften/Überschriften 3/A-E/Bindevorgang von Hand auslösen @ 62\mod_1299654780414_78.docx @ 573679 @ 22 @ 1
10.9.3
Initiate the tying process manually
Pos: 32.24 /BA/Bedienung /GroßpackenpresseBindevorgang von Hand auslösen HS Baureihe (2013-05-08 08:17:27) @ 62\mod_1299654408323_78.docx @ 573652 @ 3 @ 1
When checking the needle setting (checking the needle height on the knotter) the baling
process must be activated manually while the machine is at a standstill.
Or only for Medium version:
With the Medium version, the last bale must be baled manually before it is ejected while the
machine is at a standstill.
Fig.123
To do this:
• Swivel the safety lever (2) down.
• Move the lever (3) back to trigger the tying process.
Then move the needles upward to the knotter and back manually on the flywheel (in the working
direction) or by turning on the PTO.
Pos: 32.25 /BA/Bedienung /Großpackenpresse/Bindevorgang von Hand auslösen Hinweis Einfachknoter @ 20\mod_1238751232855_78.docx @ 224991 @ 2 @ 1
Note
In the case of the single knotter, make certain that the twines are pulled back after the last tie.
Otherwise the thread may unravel the next time a knot is tied.
Pos: 32.26 /BA/---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
Содержание Big Pack 4x4
Страница 331: ......